Sunday, November 20, 2011

It has been a while! Main Bathroom

With the warm weather that we enjoyed late into the season I did plenty of work out side, I had a lot of trees that needed to be cut down and others that needed to be trimmed. So i have done a lot of that, a lot still to do in the spring.

I am going to utilize the cold weather to continue working on my inside projects. The second bathroom upstairs needed to be remodeled, this is actually a priority because I only have one working shower right now which is located in the master bathroom, in order to have a working shower I need to fix up the main bath in order to remodel the master bath.

Everything was going really smooth until i realized that the tub cast cast iron, wow was that heavy. I decided to abort trying to move it as one piece and that I needed to break it into pieces to make it much more manageable.

Here are so photos of the Bathroom:










The sledge hammer broke right down the middle of the handle so that made it a little tricky, but that tub is gone and now I can install the new one. When I get to that I will update the Bathroom, might take some time with the holidays coming up!

1 comment: